Wellhead Location Preparation Solution

Wellhead Procurement and Maintenance

• Engineering procurement, inspection, installation and maintenance of tubular goods, Wellhead and Xmas Tree supply and services.
• Installation of Wellhead and Xmas Tree.
• Oil and Gas, Special Projects.
• Well hook-ups.
• Production facilities maintenance


Activities Include:

Acquisition survey
Location, Access road and ROW acquisition
Bush clearing and creation of access road
Stripping of top soil (preserve for site restoration)
Access road construction (Filling with sharp sand, asphalting, etc.)
Construction of Cellar pit, Slab, Early Production Drain, Drainage, Water Bore Hole, etc.
Waste pit, treatment pit, etc.
Building construction
Perimeter fencing

© 2020 Niger Delta Engineering Ltd. All Rights Reserved | Powered by: Emblic Technologies